Solar Subsidy in Gujarat

Gujarat offers attractive net metering benefits and simplified approval process

Quick Answer: Homeowners in Gujarat can get up to ₹78,000 central MNRE subsidy for residential rooftop solar. Plus Net Metering Benefits: Banking facility for excess generation, settled annually. Processing takes approximately 30-45 days.

Central

Central Government Subsidy (MNRE)

Ministry of New and Renewable Energy subsidy available nationwide for residential rooftop solar

0-3 kW
₹18,000 /kW

₹18,000 per kW for first 3 kW

3-10 kW
₹9,000 /kW

₹9,000 per kW for additional capacity from 3 kW to 10 kW

Maximum subsidy: ₹78,000 | Eligibility: Residential consumers only, up to 10 kW capacity | Processing: 45-90 days

State

Gujarat State Benefits

Available Net Metering Benefits

Banking facility for excess generation, settled annually

Max Capacity: Unlimited

Additional Incentives

Accelerated depreciation for commercial
Property tax exemption in some cities
Exemption from electricity duty

Net Metering Policy

Rollover Period

Annual

Settlement Rate

Average cost of power purchase

Key Notes for Gujarat

Gujarat has fastest approval process
Strong grid infrastructure
Highest solar irradiation in India

Frequently Asked Questions - Gujarat Solar Subsidy

Q What is the solar subsidy available in Gujarat?

In Gujarat, residential solar systems qualify for the central MNRE subsidy of up to ₹78,000 (₹18,000/kW for first 3kW, ₹9,000/kW for 3-10kW). Additionally, Gujarat offers Net Metering Benefits: Banking facility for excess generation, settled annually.

Q How does net metering work in Gujarat?

Gujarat offers net metering with annual rollover. The settlement rate is based on average cost of power purchase. This allows you to export excess solar generation to the grid and receive credits on your electricity bill.

Q How long does solar subsidy processing take in Gujarat?

Solar subsidy processing in Gujarat typically takes 30-45 days. This includes DISCOM approval, installation verification, and subsidy disbursal. Working with an MNRE empanelled vendor like Xrossways Solar can help expedite the process.