Solar Subsidy in Delhi

Ambitious solar policy with generation-based incentives

Quick Answer: Homeowners in Delhi can get up to ₹78,000 central MNRE subsidy for residential rooftop solar. Plus Generation Based Incentive (GBI): ₹2 per unit generation incentive for 5 years (residential only). Processing takes approximately 15-30 days.

Central

Central Government Subsidy (MNRE)

Ministry of New and Renewable Energy subsidy available nationwide for residential rooftop solar

0-3 kW
₹18,000 /kW

₹18,000 per kW for first 3 kW

3-10 kW
₹9,000 /kW

₹9,000 per kW for additional capacity from 3 kW to 10 kW

Maximum subsidy: ₹78,000 | Eligibility: Residential consumers only, up to 10 kW capacity | Processing: 45-90 days

State

Delhi State Benefits

Available Generation Based Incentive (GBI)

₹2 per unit generation incentive for 5 years (residential only)

Max Capacity: Varies by category

Additional Incentives

Group net metering for RWAs
Virtual net metering
Mukhya Mantri Solar Power Scheme
Simplified approval process

Net Metering Policy

Rollover Period

Monthly settlement

Settlement Rate

Retail tariff rate

Key Notes for Delhi

Very fast approval process
High electricity tariffs make solar attractive
Limited rooftop space in urban areas

Frequently Asked Questions - Delhi Solar Subsidy

Q What is the solar subsidy available in Delhi?

In Delhi, residential solar systems qualify for the central MNRE subsidy of up to ₹78,000 (₹18,000/kW for first 3kW, ₹9,000/kW for 3-10kW). Additionally, Delhi offers Generation Based Incentive (GBI): ₹2 per unit generation incentive for 5 years (residential only).

Q How does net metering work in Delhi?

Delhi offers net metering with monthly settlement rollover. The settlement rate is based on retail tariff rate. This allows you to export excess solar generation to the grid and receive credits on your electricity bill.

Q How long does solar subsidy processing take in Delhi?

Solar subsidy processing in Delhi typically takes 15-30 days. This includes DISCOM approval, installation verification, and subsidy disbursal. Working with an MNRE empanelled vendor like Xrossways Solar can help expedite the process.

Ready to Go Solar in Delhi?

Our team handles all paperwork including DISCOM applications, subsidy processing, and net metering setup. Get a free consultation today.