Commercial
Manufacturing Plant Solar Array
Gurgaon, Haryana
Completed: August 2023
Saves ₹22,000 monthly

View Gallery


About This Project
This commercial installation demonstrates our ability to handle complex industrial requirements. The system powers critical manufacturing operations while significantly reducing electricity costs. Advanced monitoring ensures optimal performance and immediate issue detection.
CommercialManufacturingCost ReductionIndustrial
Client Information
GreenTech Manufacturing Ltd.
Download Case StudyProject Statistics
System Capacity
25 MW
Solar Panels
62,500
CO₂ Offset
37,500 kg annually
Monthly Savings
₹22,000 monthly
Annual Energy Production
Monthly production capacity utilization
Loading chart...
Technical Specifications
- Panel Count
- 62,500
- Inverter Type
- String Inverters
- Mounting Type
- Ground Mount
- Expected Lifespan
- 25 years
- Co2 Offset
- 37,500 kg annually
- Energy Production
- 37,500 kWh annually
- Total Area
- 100,000 sq ft
- Annual Production
- 37,500,000 kWh
Project Timeline
May 2023(6 weeks)
Feasibility Study
Site analysis and ROI calculation
June 2023(8 weeks)
Regulatory Approvals
Government and utility approvals
July 2023(8 weeks)
Installation
Ground mounting and electrical work
August 2023(2 weeks)
Commissioning
Grid synchronization and testing
Challenges
Key obstacles we overcame during this project
- 24/7 operations requirement
- Large-scale coordination
- Minimal production disruption
Solutions
How we addressed each challenge
- Phased installation approach
- Night and weekend work
- Redundant power systems
Project Location
Residential
Commercial
Industrial
Interested in a Similar Solution?
Let our experts design a custom solar solution for your property. Get started with a free consultation today.