Skip to content
Updated for 2025

Complete Guide to Solar Power in Haryana

Everything you need to know about solar installation, subsidies, DHBVN process, state policy, and electricity savings in Haryana

₹78,000Max Subsidy
30 DaysDHBVN Approval
2.8 YearsPayback Period

Solar Power Potential in Haryana

Haryana receives excellent solar irradiation making it ideal for solar power generation

5.5-6.0
kWh/m²/day

Average daily solar irradiation across Haryana

300+
sunny days/year

Excellent sunshine duration throughout the year

1,500 kWh
per kW/year

Expected annual energy generation per kW installed

District-wise Solar Potential
DistrictDISCOMSolar PotentialType
GurgaonDHBVNVery HighUrban
FaridabadDHBVNHighUrban
PanipatUHBVNHighIndustrial
AmbalaUHBVNHighMixed
KarnalUHBVNMedium-HighAgricultural
HisarUHBVNVery HighAgricultural
RohtakUHBVNHighMixed
SonipatUHBVNHighUrban

Solar Subsidies Available in Haryana

Central government MNRE subsidy available for residential rooftop solar in Haryana

Central Government Subsidy

Subsidy Structure

  • • First 3 kW: ₹18,000 per kW = ₹54,000
  • • 3-10 kW: ₹9,000 per kW = ₹63,000
  • • Maximum total subsidy: ₹78,000

Eligibility

  • ✓ Residential consumers only
  • ✓ Grid-connected rooftop solar
  • ✓ ALMM listed solar panels
  • ✓ MNRE empanelled vendor installation

Processing Time

45-90 days through DHBVN/UHBVN

Subsidy Examples

5 kW System

First 3 kW:₹54,000
Next 2 kW:₹18,000
Total Subsidy:₹72,000

10 kW System

First 3 kW:₹54,000
Next 7 kW:₹63,000
Total Subsidy:₹1,17,000

Note: Maximum subsidy capped at ₹78,000 for residential systems

Haryana Solar Power Policy 2024-2025

Progressive policy framework supporting residential and commercial solar adoption

Net Metering Support

Haryana offers net metering up to sanctioned load with annual banking facility

Sell excess power to grid

Simplified Approvals

DHBVN/UHBVN provide streamlined approval process with clear timelines

30-45 day approval

Electricity Duty Exemption

Solar generation exempt from electricity duty charges in Haryana

Additional 6-8% savings

Priority Grid Connection

Solar installations get priority in grid connectivity and net meter installation

Faster commissioning

Key Policy Features

For Residential

  • Net metering up to sanctioned load
  • Annual banking facility for excess generation
  • Simplified approval through DHBVN/UHBVN
  • Exemption from electricity duty
  • Priority grid connectivity

For Commercial/Industrial

  • Gross/net metering options available
  • Banking facility with annual settlement
  • Accelerated depreciation benefits
  • Open access for large consumers
  • Group net metering for industrial parks

Step-by-Step DHBVN Solar Application Process

Complete guide to applying for solar net metering with DHBVN in Haryana

1

Download Application Form

1 day

Visit DHBVN official website and download the rooftop solar net metering application form. Fill in consumer details, proposed system capacity, and technical specifications.

Required Documents:

  • Net metering application form
  • Consumer electricity bill copy
  • ID proof (Aadhaar/Passport)
2

Prepare Technical Documents

2-3 days

Prepare all required technical documents including system design, single line diagram, and equipment specifications.

Required Documents:

  • Single line diagram (SLD)
  • Roof ownership proof
  • Property tax receipt
  • Solar panel and inverter datasheets
3

Submit to DHBVN

1 day

Submit completed application with all documents to nearest DHBVN office or through online portal. Keep acknowledgment receipt.

Required Documents:

  • All above documents
  • Processing fee payment receipt
4

DHBVN Review & Approval

30-45 days

DHBVN reviews application, conducts feasibility study if needed, and grants approval with technical requirements and connection agreement.

Required Documents:

  • DHBVN approval letter received
5

System Installation

2-7 days

Install solar system by MNRE empanelled vendor following DHBVN technical standards. Use ALMM listed panels, approved inverters with anti-islanding protection.

Required Documents:

  • Installation completion certificate
  • Commissioning report
6

Request DHBVN Inspection

7-15 days

Inform DHBVN about installation completion and request inspection. DHBVN team visits site to verify compliance with technical standards.

Required Documents:

  • Inspection request letter
  • Test certificates
7

Net Meter Installation

3-7 days

Upon successful inspection, DHBVN installs bidirectional net meter. System is commissioned and starts feeding power to grid.

Required Documents:

  • Net meter installation certificate

Total Timeline: 60-90 days from application to commissioning

Xrossways Solar handles the complete DHBVN process for you - from application submission to final commissioning. We ensure all documents are correct for first-time approval.

Haryana Electricity Tariff & Solar Savings

High electricity tariffs make solar economically attractive in Haryana

DHBVN/UHBVN Residential Tariff 2025
Consumption SlabRate per UnitTypical Monthly BillSolar Savings
0-150 units₹3.35₹50070%
151-800 units₹5.75₹4,60075%
800+ units₹7.10₹7,100+80%
15 kW System Economics
System Cost:₹10,05,000
Government Subsidy:-₹78,000
Net Investment:₹9,27,000
Monthly Savings:₹6,300
Payback Period:2.9 years
25-Year ROI:847%
Net Metering Benefits

DHBVN/UHBVN net metering allows you to:

  • Sell excess power to grid at ₹3-4 per unit
  • Monthly billing with annual settlement
  • Carry forward excess units up to 1 year
  • Offset high consumption months with surplus

Potential additional income: ₹2,000-4,000/month from excess generation

Haryana Solar Success Stories

Real installations across Haryana showing savings and environmental impact

Residential - Gurgaon
15 kW Villa Installation

Location

DLF Phase 3

System Size

15 kW

Monthly Savings

₹8,500

CO₂ Offset

18 tons/year

"DHBVN approval was smooth. Our electricity bill reduced from ₹12,000 to ₹2,500. System has been flawless for 18 months."

- Rajesh Kumar, Homeowner

Commercial - Gurgaon
25 MW Manufacturing Plant

Location

Sector 37

System Size

25 MW

Annual Savings

₹2.64 Cr

CO₂ Offset

37,500 tons/yr

"Largest rooftop installation in Haryana. DHBVN approval in 45 days. Zero production disruption during installation."

- Amit Kumar, Operations Director, GreenTech Manufacturing

Agricultural - Panipat
20 kW Solar Pump System

Location

Panipat District

System Size

20 kW

Monthly Savings

₹12,000

Subsidy

₹4 lakh

"Agricultural solar subsidy plus MNRE subsidy made this very affordable. Powers irrigation pumps completely. UHBVN was very supportive."

- Harpreet Singh, Farmer

Frequently Asked Questions - Haryana Solar

Common questions about solar power in Haryana

What solar subsidies are available in Haryana in 2025?

Haryana residential consumers are eligible for MNRE central government subsidy: ₹18,000 per kW for first 3 kW and ₹9,000 per kW for 3-10 kW (maximum ₹78,000). Haryana does not have additional state subsidy but offers excellent net metering with annual banking facility through DHBVN and UHBVN.

What is DHBVN and UHBVN in Haryana?

DHBVN (Dakshin Haryana Bijli Vitran Nigam) serves South Haryana including Gurgaon, Faridabad, Rewari, Palwal, and surrounding areas. UHBVN (Uttar Haryana Bijli Vitran Nigam) serves North Haryana including Ambala, Karnal, Panipat, Rohtak, Hisar. Both handle solar net metering applications.

How long does DHBVN solar approval take?

DHBVN solar net metering approval timeline: Application review (30-45 days), Installation after approval (2-3 days residential, 1-2 weeks commercial), DHBVN inspection (7-15 days), Net meter installation (3-7 days). Total process takes 2-3 months from application to commissioning.

What is the electricity tariff in Haryana for solar economics?

Haryana DHBVN/UHBVN residential tariffs: ₹3.35/unit (0-150 units), ₹5.75/unit (151-800 units), ₹7.10/unit (above 800 units). Commercial tariffs range ₹6-8/unit. High tariffs make solar very cost-effective with 2.8-3.5 year payback period.

Can I sell excess solar power to DHBVN in Haryana?

Yes, DHBVN provides net metering with annual banking facility. Excess solar generation is credited at average power purchase cost (₹3-4 per unit). Units are carried forward monthly and settled annually. This allows you to offset higher consumption months with surplus generation months.

What is Haryana solar power policy 2024-2025?

Haryana Solar Power Policy focuses on: (1) Net metering up to sanctioned load for residential/commercial, (2) Annual banking facility for excess generation, (3) Simplified approval process through DHBVN/UHBVN, (4) Exemption from electricity duty on solar generation, (5) Priority grid connectivity, (6) Support for agricultural solar pumps.

Ready to Go Solar in Haryana?

We are Haryana's leading solar installation company headquartered in Gurgaon. Complete DHBVN/UHBVN support, subsidy assistance, and professional installation. Get your free consultation today.